AGIA NAPA: Two new five star hotels (pictures)

projects sensimar hotel papachristou 03 Formatio Hotel, Ammos tou Kambouris

The creation of a five-star hotel with two wings is in front of the Department of the Environment.

A wing for families and a separate one only for adultsThe "Formatio Hotel" is a single mixed five-star mixed tourism development (hotel unit), consisting of two wings, one of which will be aimed at families, including external suites (sout suites) southeast of the development. and the other will only be addressed to adults.
The proposed development will include all common areas, facilities and parking spaces required for five-star hotel units.

According to the environmental study, the development agency of the project under study is the company "Formatio Ltd" and architects are "Eraclis Papachristou Architects" and "Skordas Design Studio".

The contractor of the study is the research office IACO Environmental & Water Consultants Ltd based on a relevant contract with the Project Development Agency.

The cost of implementing the development is estimated at € 50 million.

projects sensimar hotel papachristou 04 Formatio Hotel, Ammos tou Kambouris

In "Sand of Kambouri"
The "Formatio Hotel" Project falls within the administrative boundaries of the Municipality of Ayia Napa at the location "Ammos tou Kampouri", and occupies the plots no. 229 and 589 of the Official Gazette. 0 / 2-293- 372, with a total area of ​​84.932 sq.m.

This area in the south borders and includes a small part of the area of ​​the Natura 2000 Network "Cape Greco", in the east and west it borders with a number of individual tourist residences which are organized and accessible by local road network, while in the north it touches Kryou Avenue Water.

To the east to southeast of the proposed project, at a distance of about one kilometer is the "Kermia Beach Hotel and Bungalows", while to the west to northwest, at a distance of about 1 to 1,5 kilometers are eight other tourist units. In the wider study area, in terms of hotel units, these amount to a total of 47, of which only 4 are in the 5 * category.

projects sensimar hotel papachristou 03 Formatio Hotel, Ammos tou Kambouris

The project aims to enrich and improve the tourist product of the area, as well as to attract quality tourism.

It is noted that this unit will consist of the family-run Eastica Bellevue Park, including external suites of southeastern development, and the west wing (Atlantica Ammos Bay) which will only be addressed to adults.

The total area of ​​the buildings of the proposed single mixed tourism development, which is counted in the construction area, with the extraction of urban incentives, amounts to 29.026,65 sq.m.

Respectively, the total area of ​​the buildings of the proposed single mixed tourism development that is counted in the coverage area amounts to 10.727 sq.m. about.

projects sensimar hotel papachristou 01 Formatio Hotel, Ammos tou Kambouris

West Wing: Hotel A. Atlantica Ammos Bay
The west wing of the development, called "Hotel A. Atlantica Ammos Bay" will consist of a basement, a ground floor with a mezzanine, five floors and a terrace with houses with a mezzanine.

This wing, which is for adults only, will have a capacity of 270 rooms (or 536 beds) and will have three restaurants, five bars, 18 swimming pools (swimming pools), a gym, a spa, dance halls. , TV and reusable and offices.

A total of 169 vehicle parking spaces will be set up in this wing, 14 of which will be for the use of the disabled, as well as 10 additional bicycle parking spaces.

The total area of ​​the western wing of the development will amount to approximately 12.966 sq.m.

projects sensimar hotel papachristou 05 Formatio Hotel, Ammos tou Kambouris

East Wing: Hotel B. Atlantica Bellevue Park
The eastern development wing, called the Hotel B. Atlantica Bellevue Park, will consist of a basement, a ground floor, five floors and a terrace.

The wing will have a capacity of 317 rooms (or 634 beds), including outdoor suites, and will have three restaurants, four bars, 27 swimming pools (swimming pools), a gym, a hairdresser / barbershop, two rooms, separate reusable, TV, meeting / dance and child employment, as well as offices.

In the open space to the north of the building there will also be two sports fields, including a football field and a multipurpose sports field, while in the open air area southeast of the building there will be a children's water park.

The luxury suites (superior suites) are located at the southeastern tip of the plot under development, will have direct access from the public road east of the development, however they are an integral part of the hotel unit. These suites will be a total of twenty (20).

1,170 tourists a day, 500 employees
During development, the number of vacationers during the peak period is estimated at 1,170 per day, while an additional 500 visitors per day are estimated at restaurants, bars, shops, and all spa areas.

A total of about 500 employees will be employed in the development.

projects sensimar hotel papachristou 02 Formatio Hotel, Ammos tou Kambouris

Source: Reporter